Cloud LM-2 Series Installation Manual Page 17

  • Download
  • Add to my manuals
  • Print
  • Page
    / 36
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 16
17
OPERATION
Clearwater LM2 Series Operation
The chlorine production of the Clearwater LM2 is controlled by the number of hours
the Clearwater and filtration system are ON, as well as the setting of the output con-
trol. The power supply to this unit must be connected to the pump motor switch or
automatic timer. The chlorinator functions may only be set when the filtration system
is running.
The Clearwater LM2 includes a ‘Super Chlorinate’ feature which automatically super
chlorinates the pool for an approximate 24-hour period of pool pump operation.
The Clearwater LM2 is also fitted with 3 indicator lights that monitor the operation of
the chlorinator, the concentration of salt in the pool, and the water flow.
The Clearwater LM2 is a self cleaning unit. It is designed to require minimum opera-
tor maintenance using reverse polarity technology to minimize the scaling of the cell.
Page view 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 35 36

Comments to this Manuals

No comments